29 DORSET SQUARE, LONDON, NW1


Pictures (click to view full picture):

Dorset SquareDorset Square Dorset Square Dorset Square Dorset Square



Fourth floor mansard roof extension and ground floor rear extension of an occupied listed building.

This development created two new flats at fourth floor level and one new flat at ground floor rear. The third floor flat and basement flat immediately below the development were also completely refurbished.

As the building was occupied during the works, temporary roofs were erected, supported on scaffolding full height of the building, so that the existing tenants could stay in the building during the works.

On completion of the development, the third floor flat and basement flats immediately below the new construction were fully refurbished, the common parts were redecorated and the outside of the building was repainted.

Although Planning Permission had been granted before we took over the project, we were able to improve on the layout of the accommodation during the implementation of the works.

This was one of those projects where our client approached us one month before starting the works, but having no working drawings and only a brief specification on which the contractor had priced the works. We immediately put in place a fast track working drawing programme, geared to providing information immediately ahead of the contractor's construction programme, and ensured that the contractor was never short of information and the project was never held up.


Client: 29 Dorset Square Ltd
Lead Consultants & Financial Consultants: P+R Associates
Structural Engineers: Richard F Gill & Associates
Party Wall Surveyors: Cyril Silver & Partners
Funding Bank's Surveyors: Paul Jennings Associates
Floor area of new construction: 120m - (1,300 sq.ft.)
Floor area of refurbishment: 125m - (1,350 sq.ft.)